Well 2018 has just started but October will be here before we know it. We have a large list of boat jobs and not a lot of time. Most of the jobs are Johns and some have to wait for warmer weather. Here is our list.
• Replace hatch glass and gaskets
• Install air conditioning/heating unit
• Haul out and paint bottom
• Repair fiberglass and paint top
• Install water purifier
• Install new fridge
• Install new cook top
• Install floor
• Install LED lights and fans
• Install 2nd holding tank
• Sew new stack pack
• Sew dingy chaps
• Sew sheet bags
• Sew sun shade
• Re-cover settee
• Add A/C and 12 volt receptacles
• Anchor windless
• Add steps to aft beds, to cabin roof and cockpit
• Check thru hulls
• Buy and install grill
• Install swim ladder
• Add hand rails to the scoops
• Install inverter
• Install portable freezer
• Tighten lifelines
• Order new sails
• Replace VHF radios
• Replace running rigging
• Get and mount generator
There are many more little items but we have a LOT to do.